Independent tree-rule information · Not a government or arborist service

Local tree-rule guide

Richmond Hill tree rules

Private-tree rules are present; check size/location exceptions.

Last verified: September 28, 2026Primary municipal source reviewed September 23, 2026

The local rule

Richmond Hill requires a permit before injuring or removing a private tree with a diameter of 15 cm or more measured at 1.4 m above grade.

The Tree Preservation By-law also covers injury, so roots, grading and construction around a protected tree can matter even when removal is not planned.

Local exceptions and conditions

Scope and protected trees

  • Richmond Hill's Tree Preservation By-law 19-25 protects private trees with a trunk diameter of 15 cm or greater measured 1.4 m above ground.
  • It defines injury to include removing more than 20 per cent of live tissue in a 12-month period and encroaching into the Tree Protection Zone.
  • The City gives a radius table: a 15–20 cm tree has a 2.0 m zone, a 41–50 cm tree 3.0 m, and a 71–80 cm tree 4.8 m.
  • Excavating for a patio or pool can therefore need review even when nobody proposes to fell the tree.

Applications and timing

  • Richmond Hill requires an arborist report with a private Permit to Injure or Destroy application.
  • Its online form asks for tree details and replacement plan; subdivision or site-plan applications include a tree inventory and preservation plan within the development review.
  • The City may inspect, require changes and attach replacement or cash-in-lieu conditions.
  • The public permit page does not guarantee a fixed decision time for each application.
  • Its replacement table rises with trunk size: 15–20 cm generally corresponds to one replacement tree and a tree over 100 cm to seven.
  • Confirm the current application fee and conditions at submission.

Enforcement and exceptions

  • An unauthorized removal or root-zone injury can lead to penalties under the 2025 bylaw and the City's administrative penalty process, with exact amounts depending on the violation.
  • The bylaw's protected-tree diameter is the general private threshold; an individually protected tree in an approved site plan or a public tree must be checked separately.
  • A storm-related temporary permit suspension reported for an earlier event should not be treated as a standing exemption.

Graduated replacement requirements

  • The replacement table is deliberately graduated rather than a one-for-one rule.
  • It allocates two trees for a 21–40 cm removal, three for 41–50 cm, and more at larger sizes.
  • A permit holder should calculate planting space before assuming every required replacement fits beside a driveway.
  • The City's form provides a way to notify staff that replanting is complete or arrange cash in lieu, so the obligation continues after the arborist removes the old tree.

Roots, soil and construction

  • Richmond Hill's By-law 19-25 reaches work that many owners would call landscaping.
  • The tree protection zone extends out from a 15 cm or larger protected private trunk, and the bylaw treats root-zone encroachment and removal of more than 20 per cent of live tissue within 12 months as injury.
  • A retaining wall or patio can therefore require a permit even when the tree stays upright.
  • The graduated replacement schedule makes the size survey meaningful: the number of new trees rises with DBH, and an owner planning to pave most of a small lot should ask about planting capacity before applying.

Report and site-plan requirements

  • An arborist report is part of the permit file, along with a plan showing what will be cut, retained and replanted.
  • Subdivision or site-plan projects need a fuller inventory and protection strategy.
  • If a protected neighbour tree's roots run under the proposed works, a boundary sketch and the neighbour's rights should be resolved before digging; a permit for the owner's tree does not grant ownership of the neighbour's stem.
  • The City's online process can condition approval on replacements or cash in lieu and may check completion after removal.
  • An old storm-related temporary pause in permits is not a standing exemption from the 2025 bylaw.

Before work starts

  • Ownership: check the property line. Public and boundary trees may follow a different process.
  • Site context: review any development approval, covenant or protected-area conditions.
  • Work requirements: confirm any permit, exemption or protection requirements that apply to the planned work.

Official sources

Last verified: September 28, 2026 · Primary municipal source reviewed September 23, 2026. Rules can change; confirm with the local authority before work. How we research

Local detail review: September 28, 2026.